Global

Chapter 17 - Breaking Ground

Two weeks later, the official notification arrived from the Commonwealth of Kentucky Procurement Division: Bluegrass Industrial Laundry had been officially awarded the five-year Norton Healthcare regional linen contract.

The following Monday morning, the real work began.

The thud of a demolition hammer echoed against the south masonry wall of the plant. A construction crew from Shelbyville arrived at dawn, knocking out the old non-load-bearing brick to clear room for the new sanitary bay.

Colby stood on the concrete slab, holding a set of industrial blueprints, shouting instructions to the crane operators guiding a massive forty-foot stainless-steel tunnel washer off a flatbed trailer.

"Watch the hydraulic clearance on that manifold!" Colby barked, waving his yellow grease rag. "Set her down like a newborn baby!"

Romy was down in the pit, wearing her steel-toed boots and hardhat, checking the foundation anchor bolts with an electronic level. She had spent the last two weeks coordinating delivery schedules, hiring thirty new operators from the county, and setting up training modules for medical linen handling.

I stood beside Colby, our coffee cups steaming in the cool morning air.

"She’s got Gordon’s eye," Colby said, squinting through the dust at Romy. "Look at her. She caught a two-millimeter grade error on that drainage trench before the concrete crew even poured the footer."

"She’s better than Gordon," I whispered with a smile. "Gordon was stubborn as a mule when an intake pipe didn't fit. Romy finds a way to make it flow."

May you like

Colby chuckled, a deep, raspy sound. "Well, Martha, we’re gonna need every gallon of water that city main can pump. We go live in forty-five days."

"Then we better get our hands dirty," I replied, pulling my work gloves from my back pocket.

Related Stories

Other posts